QUALITY CONTROL / 07 CHECKPOINTS
Quality is verified before the machine reaches your line.
KINCOTO connects requirement review, controlled assembly, software verification, actual-chip validation and factory acceptance testing in one documented quality process for IC programming automation.
Discuss Your Validation PlanCONTROLLED WORKFLOW
A traceable inspection path
Each checkpoint confirms the inputs needed by the next stage, reducing configuration errors and keeping the delivered system aligned with the approved IC, package and handling format.
- 01



REQUIREMENT CONTROLIncoming material inspection
Incoming Material Inspection: Upon receiving materials, IQC conducts rigorous inspections to ensure their conformity.
- IC model and datasheet
- Tube, tray or tape format
- Capacity and inspection needs
- 02
INCOMING CONTROLProduction process inspection
As materials are fed onto the production line, IPQC conducts random checks while production is underway to ensure accuracy and conformity of installation standards.
- Model and quantity check
- Appearance and condition review
- Project specification matching
- 03

BUILD CONTROLProduction process inspection
IPQC process inspection: During production, random sampling is conducted to check if the installation is up to standard.
- Mechanical alignment
- Electrical wiring inspection
- Safety and motion checks
- 04
SYSTEM CONTROLIPQC Inspection
IPQC process inspection: During production, random sampling is conducted to check if the installation is up to standard.
- Control logic verification
- Interface and alarm checks
- Robot sequence validation
- 05
DEVICE VALIDATIONFQC Finished Product Inspection
FQC Finished Product Inspection: After all production is completed, all finished products are inspected.
- Sample device programming
- Socket and orientation check
- Read-back and result review
- 06
PERFORMANCE CONTROLOQC Outbound Inspection
We will check the packaging again before shipping, and only release the goods to the customer after confirming that everything is in order.
- Continuous cycle observation
- Handling and throughput review
- Factory acceptance coordination
- 07
RELEASE CONTROLVacuum packaging in wooden crates
Fumigation-free plywood crate + internal aluminum foil vacuum bag
- Configuration confirmation
- Accessories and document check
- Packaging release inspection
